Flood Control, Site Remediation & Site Improvements to Harbor Brook
City of Meriden
Meriden, CT
Project Description
Clear grub, site prep, mass earth exc., silt fence, removal of storm drainage systems, channel excavation, installation of concrete head walls, epoxy repair, masonry repair, general paving, minor upgrading of roadway, widening of road, underground storage tank removal, installation of bridges that exceeds 50', bridge which spans over 200', installation of drainage channel, erosion protection, drainage spill ways, pile driving, some construction of bridge joint and membranes systems, temporary traffic control: use of temp precast barrels, traffic cones, hydro seeding, mulch, sodding, environmental hazardous waste removal, stock pile, testing and pumping contaminated groundwater through frac tanks.
Designer:
Milone & MacBroom