Bradley Hospital Retaining Wall Replacement
The Hospital of Central Connecticut
Southington, CT
Project Description
Excavation to remove and replace existing retaining wall, installation of E-Z wall grid approx. 330’ x 6’, drainage.
Designer:
Town of Southington