Work Experience
LaRosa Construction has 70 years of contracting and construction experience. Please see below for some examples of our completed projects.
Name of Project | Project Description | Client |
---|---|---|
AT&T and Frontier Real Estate Division | Snow removal, spring clean-up, paving, concrete work | AT&T/Frontier |
AT&T Conduit Construction Division | Manhole, conduit repair and installation | Various AT&T locations in CT |
Bear Industries, LLC | Sitework - new building | Bear Industries, LLC |
Broad Street Water Main | Installation of water mains, pavement restoration, landscape restoration, utilites and hydrants | The MDC - Hartford, CT |
Foster’s Pond Dam | Construction of new concrete spillway and outlet chambers, inlet and outlet piping. Compact embankment, riprap and appurtenances; installation of footbridge and roadway guardrails | City of Meriden |
Hubbard Park Notch Road Repairs | Double precast wall installation, drainage, site work, bypass pumping and final restoration | City of Meriden |
Mackenzie Reservoir Project | Sediment removal from public drinking supply. Included culvert work, water handling, erosion control and general earth works. | Town of Wallingford |
Meriden Landfill | Solar array installation | Commonwealth Electical Technologies |
Merimere Water Treatment Plant Lagoon Improvements | Installation of liners and storm drainage | City of Meriden - Water Department |
MDC | On-call 24-hour emergency construction services | The Metropolitian District |
North Haven Medical Complex | Complete site work and utilities package | The Casle Corporation |
North & South Meadows Base Contract Work | Sediment Removal and installation of 1,300 LF of new water lines | City of Hartford |
Pomeroy Avenue Medical Office Complex | Complete site work and utilities package including 1,450 LF of new water main | The Casle Corporation |
Retention Basin Abandonment | Improvements to concrete recycling facililty. Cleaning settling pond, abandonment of existing retention basin along with site grading and restorations. | Suzio Concrete |
South Center Street Water Main Replacement | Iron water main replacement, water service laterals, gate valves and boxes, driveway and roadway restoration. | Southington Water Department |
Suzanne Lemberg Usdan University | Alterations to University Center & Fayerweather Hall. Total site package including concrete flatwork. | FIP Construction Co., Inc. |
Yale Graduate Housing | Phase 1 - Esplanade Apartments. All site work and excavation. Utility work; sewer, storm, electical. Storm structures; area drains, catch basins, SMH, yard drains, detention systems and oil-trash-sediment separator. | Babbidge Construction Co., Inc. |